What is the capacity of jurala project?

What is the capacity of jurala project?

The project has a gross capacity of just 9.66 tmc. The current reservoir level of 1,053.08 feet is just a little short of its total storage capacity of 1,045 feet at FRL. Since June 1, when the water year began, Jurala has received total of 39.25 tmc of water, with a flood cushion of 1.19 tmc.

How many gates are there in Priyadarshini Jurala project?

Salient Features

LOCATION:
State : Telangana
Water spread area at FRL/ MWL : 67.68 Sq km (16,724 acres) including river course
Length of barrage between abutments : 1322 mt (spill way 927 mt & power blocks 162 mt)
No. & Size of spillway gates : 62 radial gates of size 12 mt x 8.516 mt

Where is jurala project located?

The Jurala project, which is also known as the Priyadarshini Project is located at a distance of 10 kilometers from Kurvapur village in the Mahabubnagar district of Telangana.

What is Tungabhadra project?

Tungabhadra dam also known as Pampa Sagar is a multipurpose dam built across Tungabhadra River in Hosapete, Ballari district of Karnataka. It was built by Dr. Thirumalai Iyengar in 1953.

Who built jurala dam?

Telangana State Power Generation Corporation Ltd.
The power projects constructed and maintained by Telangana State Power Generation Corporation Ltd.

Who built jurala project?

What is the main object of Tungabhadra project?

The dam is in Hosapete, Vijayanagara district of Karnataka. It is a multipurpose dam serving irrigation, electricity generation, flood control, etc….

Tungabhadra Dam
Height 49.50 m (162 ft) from the deepest foundation.
Length 2,449 m (8,035 ft)
Spillway capacity 650,000 cusecs
Reservoir

When was the Priyadarshini Jurala Dam completed?

The Priyadarshini Jurala Project (PJP) or Jurala Project, is a dam on the Krishna River situated about 15 km from Gadwal, Jogulamba Gadwal district, Telangana, India . The project was completed in 1995. The Jurala has a full reservoir level of 1045 ft and has a full capacity of 11.94 TMC.

Where is lower Jurala hydro electric project located?

/  16.31306°N 77.77722°E  / 16.31306; 77.77722 /  16.31306°N 77.77722°E  / 16.31306; 77.77722 Lower Jurala Hydro Electric Project ( Telugu: లోయర్ జూరాల జలవిద్యుత్ ప్రాజెక్ట్) is a major on-going Hydro Electric Project near Mulamalla Village, Atmakur Mandal, Jogulamba Gadwal district, Telangana.

When was The Jurala power project in Telangana completed?

The project was completed in 1995. The Jurala has a full reservoir level of 1045 ft and has a full capacity of 11.94 TMC. As of August 2013, the project has an estimated capacity of 9.74 TMC. The Jurala Project was completed in 1995 The power projects constructed and maintained by Telangana State Power Generation Corporation Ltd.

How big is the reservoir of Jurala power plant?

The Jurala has a full reservoir level of 1045 ft and has a full capacity of 11.94 TMC. As of August 2013, the project has an estimated capacity of 9.74 TMC. The Jurala Project was completed in 1995 The power projects constructed and maintained by Telangana State Power Generation Corporation Ltd.